Excavation tank, no grading, no working face volume online calculator



App Description

Calculation formula for digging trench, no grading, no working face volume:

\(V=L \cdot A \cdot H\)

A—pit width

H-ground pit excavation depth

L-length

Usage example

Input data:

A—pit bottom width: 6

H-ground pit excavation depth: 7

L—length: 4

Click "Calculate" to output data

Digging trench grading without working face volume: 168

 

    Sign in for comments!
Comment list (0)

Evaluation

Powered by TorCMS (https://github.com/bukun/TorCMS).