Calculation formula for the volume of excavation, grading and no working face:
\(V=L(A+KH)H\)
In the formula:
V——Digging groove, grading without working face volume
A——Depression width
H——The depth of pit excavation
L - length
K——grading slope coefficient
Input data:
A—pit bottom width: 5
H-ground pit excavation depth: 6
L—length: 4
K—grading slope coefficient: 7
Click "Calculate" to output data
Digging trench grading without working face volume: 432
Powered by TorCMS (https://github.com/bukun/TorCMS).